Low-voltage panel during prewire. A SoulCraft process photo, not a finished system.

Building in Brookhaven or Buckhead? What to Prewire Before Drywall

For homeowners and builders, while the studs are still open.

If you are building in Brookhaven or Buckhead, the weeks before drywall decide where the network, the TVs, the speakers, the cameras, and the shades will live. This is for homeowners and for the builders putting up houses in the $800,000 to $1.7 million range. SoulCraft Systems was founded in 2010. The people here have 25+ years of industry experience. Atlanta is (404) 590-7685. The North office is (706) 982-3327.

Custom installers spend more of their work on the network than on any other category in the latest industry count. CEDIA's 2026 U.S. Professional Smart Home Market Analysis, reported by Anthony Savona in Residential Systems on November 9, 2026 ("The State of the Industry 2026"), puts home networking at 15% of the work, the biggest category in that list, with distributed audio at 11% and lighting and shading at 11%. That is the order we walk a Brookhaven or Buckhead plan: the network first, then the rooms that play music, then the lights and the shades.

A finished house is a different job. See prewire vs retrofit. Builders who want the field list can use the prewire checklist and the page for low-voltage prewire for builders.

Network drops and Wi-Fi access point locations

Home networking leads that CEDIA list because the rest of the house depends on it. Before drywall we mark a home run to every TV, every office, and every place an access point should sit, and we bring those runs back to one ventilated rack. Access points still need a cable. A mesh that only repeats a weak signal is how a bedroom at the far end of a Brookhaven ranch stays slow.

On a Buckhead plan the access points belong near the middle of each floor, and a terrace where you sit in the evening gets its own drop when the plan shows you out there. On a new Brookhaven infill house the lot is tighter. We still mark a wired access point for each floor, then confirm the count on the drawings. The longer version of why the wire still matters is why a wireless home still needs wires. The service page is networking and Wi-Fi.

TV and surround

Every TV location needs a cable, power where the set will hang, and backing in the studs if the wall will hold a larger set. A surround room also needs speaker wire to the seats, including the ceiling if you want sound from above, before the drywall closes those paths. In Buckhead a basement is a natural place for that room. In Brookhaven it is often the family room of a ranch, or the main room of a new house on a narrow lot. The wire goes in now. The screen can be chosen later. See television and surround sound and, if the room might become a theater, dedicated theaters and media rooms. Buckhead basement notes are on home theater in Buckhead.

In-ceiling and in-wall speakers

Distributed audio is next on that CEDIA list, at 11%. In-ceiling speakers in the kitchen, the family room, the primary bedroom, and a covered porch, and in-wall speakers where a ceiling will not take a cut, need wire while the studs and joists are open. We leave a loop at each spot and a home run to the rack. A covered porch or a terrace can take its own pair, made for weather, on the same system. See whole-home audio.

Cameras

A camera at the front door, one on the drive, and a doorbell are the camera runs we put in before drywall on these houses. On a tight Brookhaven lot the view stays on your door and your drive. Cable to the eaves is a simple pull now. The choices between battery, wired, and PoE are on Ring 4K: battery, wired, or PoE. The service page is surveillance and security.

Lutron lighting and shades

Lighting and shading sit with distributed audio at 11% of that same CEDIA list. We are smart lighting experts, and on a new Brookhaven or Buckhead house the lighting and the shades are planned with the wire. Lutron keypads need a home run. Shade pockets, and power for the shades, need to be framed before stone and trim lock the header. South and west glass in Buckhead, and the front rooms of a Brookhaven house, are the windows we look at first. Caséta, RadioRA 3, and HomeWorks are compared on lighting and shades.

Start a Plan

If you already have a floor plan, Start a Plan on the Prewire Planner. It is a room-by-room starting point you can print or save. A written proposal comes after we see the plans. Then call Justin in Atlanta at (404) 590-7685 or Ryan at the North office at (706) 982-3327. We coordinate with your builder so the low-voltage work lands in the right walls. Georgia low-voltage license LVT305289. North Carolina license SP.FA/LV.37584.

Our Work

Wiring chase with conduit and cables before drywall
Low-voltage cables bundled into a panel before drywall
Ceiling speaker location before drywall
Rack shelf framed in before drywall
Prewire on a Clarkesville job
Great-room ceiling speakers in a Lake Rabun house

Questions

For a Brookhaven or Buckhead house that is still open. Atlanta is (404) 590-7685. The North office is (706) 982-3327.

What should I prewire before drywall in Brookhaven or Buckhead?

Network drops to the TVs, the office, and the Wi-Fi access points, speaker wire for in-ceiling and in-wall speakers, cable for the door and the drive, and the keypad and shade runs for Lutron. All of it comes back to one rack. You can Start a Plan on the Prewire Planner.

Where do the Wi-Fi drops go on a new Brookhaven or Buckhead plan?

Near the middle of each floor, plus any terrace or porch where you actually sit. We confirm the count on the drawings before rough-in. Each access point gets a cable back to the rack.

What is the difference between the prewire and the later install?

The prewire is the wire, the boxes, and the backing while the walls are open. The speakers, TVs, keypads, and trim go in later, when the house is ready for them.

Do you coordinate the prewire with my builder?

Yes. We work with the builder, the electrician, and the other trades so the low-voltage work lands on time and in the right walls in Brookhaven and Buckhead.

Low-voltage rough-in on a job site